Sign In | Join Free | My portofva.com
China Xian WAGE Traffic Infrastructure Installation Co., Ltd. logo
Xian WAGE Traffic Infrastructure Installation Co., Ltd.
Making travel more safer.
Verified Supplier

2 Years

Home > Asphalt Patch Material >

Modified Asphalt Patch Material For Road Crack Repairing

Xian WAGE Traffic Infrastructure Installation Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Modified Asphalt Patch Material For Road Crack Repairing

  • 1
  • 2

Brand Name : Wage

Model Number : HG TP

Certification : EMS, OHSMS

Place of Origin : China

MOQ : 1 ton

Price : FOB 1800- 1900 USD per ton

Payment Terms : L/C, T/T, Western Union, MoneyGram

Supply Ability : 20 tons per week

Delivery Time : 1- 3 weeks

Packaging Details : White PE bag,N.W.10kg/bag. 1000kg/pallet.

Main : modified asphalt

Color : black

Type : thermoplatic

Apperarance : Granules

Operation Melt temperature : 280°C

Curing Time : 5-8 minutes

Contact Now

Asphalt Road Patching Material For Road Crack Repairing

Thermoplastic asphalt road repare patching materialModified Asphalt Patch Material For Road Crack Repairing

General Description

This material is an elastic repair material, composed of modified asphalt, chalk powder, polymer materials, quartz sand, rubber powder, and other materials mixed with special additives.

Special for hot-applied, aggregate-flled, polymer-modifed asphalt pavement repair mastic, used for repairing distresses in asphalt .

Modified Asphalt Patch Material For Road Crack Repairing

Product Specifications

Item Range
Apperarance Granules
Color Black
Operation Melt temperature 280°C
Curing Time 5-8 minutes

Application:

* Filling wide cracks and joints

* Filling potholes

* Road reticular crack repairing

* Pretreatment of fatigue cracked are prior to surface maintenance

* Repairing and Leveling manhole covers

* Leveling bridge deck approaches

* Repairing deteriorated longitudinal joints such as tramcar

* Filling spalls, popouts,and breaks, etc

Modified Asphalt Patch Material For Road Crack Repairing

Packaging

White PE bag,N.W.10kg/bag.

1000kg/pallet. 1.2*1.0*1.0M size for pallet

Storage

The product can be stably stored for at least one year when kept in a dry place at temperature below 30°C.Avoid exposure to direct sunlight.

Using step

1.Clean the moisture and dust in the area to ensure they are dry and clean

2.Use a thermoplastic boiler to heat the elastic asphalt patching material to 280 ℃

3.Choose different widths of coating scoop based on the size of crack or other damage

Modified Asphalt Patch Material For Road Crack Repairing

Caution

When the material is melt will keep a high tempreture on itself and machine or tools, pls mind the scald

Contact

Rita QU

Xi'an Wage Traffic Infrastructure Installation Co.,LTD
Mail: wagetraffic@hotmail.com Cell/ Whatsapp: +86 15591818803
Add:Room 401, Unit 2, Bilding 2, Shenglong Plaza, Weiyang Road, Xi'an, 710016, Shaanxi, China

Product Tags:

Modified Asphalt Patch Material

      

asphalt patch For Road Crack Repairing

      

Road Crack Repairing asphalt patch

      
China Modified Asphalt Patch Material For Road Crack Repairing wholesale

Modified Asphalt Patch Material For Road Crack Repairing Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Xian WAGE Traffic Infrastructure Installation Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)